COMAH

At IHF we have a wealth of experience working with COMAH sites, in particular helping COMAH sites demonstrate compliance with the new regulations. We have helped organisations responsible for critical infrastructure through to boutique distilleries to ensure their COMAH capability and compliance exceeds the COMAH Regulations 2015 guidelines.
We have had numerous successes in lifting Actions Legal imposed on COMAH establishments and upstream oil and gas companies. In fact, we have never in our 7 year history failed to adequately address regulatory expectations either in advance of an inspection or addressing issues after an inspection.

1

Some examples of our success include:
Interconnector: Interconnector controls the UK – Belgium Methane-transfer pipeline. IHF have been engaged to conduct HAZID studies, safety-critical task analysis and provide general human factors advice.
United Molasses Storage (UMS):At the recommendation of the HSE, UMS approached IHF with an urgent need to review and re-design their Management of Change procedures and documentation for their Hull and Liverpool Bulk Liquid Storage facilities. This procedure is now in place across all UMS sites in the UK.
Tennants Distribution: IHF reviewed and updated two Safety Critical Procedures from an HEA and HRA perspective for Tennants Distribution. This was conducted using our systematic method that includes the COMAH delivery guide and SRAM, IHF experience/expertise and very recent guidance provided to us by the regulator.

Training

IHF designs, develops and delivers highly experiential and interactive training for organisations of all sizes within the Oil & Gas sector. These courses include:

  • e-Learning
  • Major Accident Hazard awareness (MAH)
  • Human Factors Awareness (HFAT)
  • Safe Working Behaviours/Behavioural Based Safety (SWB/BBS)
  • NOTECHS and CRM
  • Train the Trainer

Document Design & Use

IHF is highly skilled at Gap Analysis, development and production, and re-design and reformatting of documents in isolation or as part of a wider HF intervention.

Shiftwork

IHF are industry experts on Fatigue Risk Management (FRM) – audit, re-design, implementation and review.


Workload & Staffing Levels

Task Analysis and Time Line Analysis, and measuring the impact of Performance Influencing Factors (PIFs) are some of the techniques IHF have used to improve safety and business performance as a result of improving inefficient workload and staffing levels.


Communication

IHF can conduct evaluation of communication, decision-making, awareness, workload and Team Performance Analysis within the framework of the SHELL model.

Tasks

Safety Critical Task Analysis (SCTA), Cognitive Task Analysis (CTA), Task Analysis (TA), Human Risk Analysis (HRA)


Competence Management

CoW Training, NOTECHS Assessment & Measurement


Safety Systems

Procedural Review, Barrier Models, SHELL, Dirty Dozen


Maintenance

MIT, SHERPA


Qualitative Hazard Analysis

HAZID, HAZOP, HAZAN, HMI Review, HRI


Quantitative Risk Analysis

HEART, CREAM, ATHEANA, THERP, Goal Structured Notation

Management of Change (MoC)

Gap Analysis, Document review & Design/Re-Design


Procedures

Task Analysis, Cognitive Task Analysis, Safety Critical Task Analysis, Organisational Walkthroughs


Emergency Preparedness & Response

Reliability Assessment, Analysis, Assessment and development of Procedures


Incident/Accident Investigation

Critical Incident Technique, Root Cause Analysis, Fault/Event Tree Analysis


Project Planning, Design & Execution

HFIP, ISSoW replacement programs


Safe Work Practices and Permit-to-Work

CoW, ePtW/PtW, Working at Height, Confined Space Entry, ISSoW & ISSoW Replacement Planning, implementation & Training

Process Equipment Design

HMI style-guide authorship, Verification, Design layout to BS EN & ISO standards


Labelling

Development of Labelling schema, Zonal Analysis


Facilities & Workstation Design

Link Analysis, SHERPA, Anthropometric Assessments, Ergonomic Assessments, Tooling Layouts

Control Centre Design

Development of Mock-ups, Participatory design Review, Ergonomic Design & Layout, Link Analysis, Workload Analysis


Alarm Management

Task Analysis for alarm scenarios, FEED of Alarm Systems, Overhaul of alarm triggers, colour schemes and alarm philosophy, Assessments Reviews, Audits and Development, Manuals and Procedures, Qualitative Reliability Assessment


HMI

AI Design (Assessment and Review), HMI Design and Verification, Development of Wireframes

Questions?

If you have any questions about what we can do for your business or if you're interested in one of our courses, please don't hesitate to contact us.

Courses and Training

We at IHF can help your business in many different ways. We have extensive knowledge in many different parts of the transport industry, here are a few of our most popular courses and training alternatives

Introduction to Human Factors

Introductory course for Human Factors and how they can impact your work.
More info

Situational Awareness

We guide you through a number of SA hazard risks and how to recognise them.
More info

Human Dynamics Training

Reduce human error, increase reliability and harness the collective power of a team with with our Human Dynamics Training.
More info

Risk Assessment Team Leader

The RATL course is aimed at experienced risk assessors, to enable participants to preside over better semi-quantitative risk assessments.
More info